Yan Yean Road (Stage 2), Yarrambat and Doreen

Consultation has concluded

Project description

As part of the Yan Yean Road Upgrade (Stage 2), we will:

  • widen the road from one to two lanes in each direction between Kurrak Road and Bridge Inn Road
  • install traffic lights to replace the roundabouts at Orchard Road and Bridge Inn Road
  • install new traffic lights at North Oatlands Road and Bannons Lane
  • install new roundabouts at Heard Avenue and Jorgensen Avenue
  • upgrade the intersection at Ironbark Road
  • add service lanes to give safe access to residential properties
  • build new walking and cycling paths along the full length of the road
  • add centre and kerb side safety barriers along the road.

Project benefits

The Yan Yean Road Upgrade (Stage 2) will:

  • improve traffic flow and travel times
  • improved access to local and growing residential and recreational centres in the north
  • make it easier and safer for you to walk or cycle around your local area
  • provide two lanes in each direction between Diamond Creek and Bridge Inn roads
  • lower the risk and severity of crashes with safety barrier.

As part of the upgrade, we plan to: add an extra lane in each direction between Kurrak Road and Bridge Inn Road install new and upgrade existing intersections build a walking and cycling path install safety barriers along the road.

Project description

As part of the Yan Yean Road Upgrade (Stage 2), we will:

  • widen the road from one to two lanes in each direction between Kurrak Road and Bridge Inn Road
  • install traffic lights to replace the roundabouts at Orchard Road and Bridge Inn Road
  • install new traffic lights at North Oatlands Road and Bannons Lane
  • install new roundabouts at Heard Avenue and Jorgensen Avenue
  • upgrade the intersection at Ironbark Road
  • add service lanes to give safe access to residential properties
  • build new walking and cycling paths along the full length of the road
  • add centre and kerb side safety barriers along the road.

Project benefits

The Yan Yean Road Upgrade (Stage 2) will:

  • improve traffic flow and travel times
  • improved access to local and growing residential and recreational centres in the north
  • make it easier and safer for you to walk or cycle around your local area
  • provide two lanes in each direction between Diamond Creek and Bridge Inn roads
  • lower the risk and severity of crashes with safety barrier.

As part of the upgrade, we plan to: add an extra lane in each direction between Kurrak Road and Bridge Inn Road install new and upgrade existing intersections build a walking and cycling path install safety barriers along the road.

CLOSED: This discussion has concluded.
Why don't you ask a question?